POSTED DATE: 23/11/2011
COMPANY NAME: THDC INDIA LTD
COMPANY PROFILE:
The Tehri Dam & Hydro Electric Project had initially been accorded Investment Clearance by the Planning Commission in June, 1972 for implementation by the Government of U.P., with an installed generating capacity of 600 MW. The State Government commenced the construction of the Project in 1978. Subsequently, in 1983, the proposed Installed Capacity of the Project was increased by the State Government to 1000 MW.
In view of the shortage of funds for implementation of the Project in the State sector, it was decided in Nov.,1986 to implement the Tehri project as a Joint Venture of the Govt. of India and Govt. of U.P. through financial and technical assistance from erstwhile USSR.
In Nov.,1986, an agreement on economic and technical co-operation between the Govt. of India and Govt. of USSR was signed, which interallia included execution of the 2400 MW Tehri Hydro Power Complex comprising 1000 MW Tehri Dam & Hydro Power Plant, 400 MW Koteshwar Dam & Hydro Power Plant and 1000 MW Tehri Pumped Storage Plant. This agreement envisaged financing in the form of credit amounting to 1000 million Roubles from USSR.
The Government had also approved seeking the technical and financial assistance from the then USSR for implementing the Tehri Power Complex. However, with the disintegration of USSR, the financial assistance from USSR was not available.
HDC, a Joint Venture Corporation of the Govt. of India and Govt. of U.P., was incorporated as a Limited Company under the Companies Act,1956, in July’88, to develop, operate and maintain the Tehri Hydro Power Complex and other Hydro Projects. The works were handed over to THDC in June 1989.
The equity portion the Project is being shared by Govt. of India & Govt. of U.P in the ratio of 75:25.
The Corporation has an authorised share capital of Rs.4000 cr.
The Government approved the implementation of Tehri Dam and HPP Stage-I (1000 MW) in March,1994, alongwith the essential works of Pumped Storage Plant and committed works of Koteshwar HEP. Other components of the Tehri Power Complex, viz., Koteshwar Project, and the Pumped Storage Plant, were envisaged to be taken up at a later stage
FIELD OF WORKING: Core/Tech/Govt
JOB ROLE: Engineer Trainee/Executive Trainee
SALARY OFFERED: Check details
JOB LOCATION: Delhi
VENUE [Written Test]DATE: 8/1/2012
LAST DATE: 10/12/2011
REQUIRED QUALIFICATION: B.E/B.Tech/ME/MSc/MBA
EXPERIENCE REQUIRED: Freshers
CANDIDATE PROFILE:
- B.E/B.Tech/ME/Msc graduates from any recognized university.
- All candidates must have minimum 65% from their 10th to graduation.(for SC/ST candidates minimum pass mark.
- For more details click on image.
APPLY MODE: Online+Postal
HOW TO APPLY:
Interested candidates apply this position in online before 10/12/2011 and send the computer generated online application and send it to following address with required documents before 18/12/2011.
Applicatio Fees : Rs.500/-[for general] for SC/ST no fees
For more details: Click here
Apply online: Click here
CONTACT DETAILS[Postal] OF COMPANY:
The Advertiser,
THDC India Ltd.,
P.O. Box No.-9248,
Krishna Nagar,
Head Post Office,
Delhi-110051
WEBSITE DETAILS OF THE COMPANY: www.thdc.gov.in
SOURCE: THDC Career Link
No comments:
Post a Comment